Fluidstack launches Blackbird modular data center (400 MW)

Fluidstack@fluidstackNov 24, 2026

Today we’re launching Blackbird, a 400 MW modular data center designed to be built within six months of groundbreaking. Modules are designed to arrive on site integrated and tested, which we expect to reduce build time by two-thirds or more. We’re launching three products: 1/5 https://t.co/88Ra8bBqAQ

Views74.2k
Comments31
Reposts36
Likes401
Launched Nov 24, 2026View post

See all Fluidstack launches →